Budgeting · 4 min read
How much does an extension cost on the Mornington Peninsula and Bayside?
Where the price of adding bedrooms, living space and bathrooms to a family home starts, what pushes it up from there, and a recent extension of ours as the worked example.
Last reviewed 25 November 2026
The short answer
For most growing families, an extension is about the same few things: another bedroom or two, somewhere for the kids to spread out, and staying in the house and the street they already know. Here is roughly where those jobs land.
-
Smaller rear additions
An extra bedroom or two, or a rumpus room, built onto the back of the house without a new bathroom. Typically from around $150k.
-
More substantial extensions
The same idea with a new bathroom, ensuite or laundry included, or simply more floor area. Usually well above that, depending on size and finishes. There's no set ceiling, because your design decides the number.
-
Second storeys and knockdown-rebuilds
Quoted individually. Too much depends on the existing structure and the site for a band to be honest.
Renovating rather than extending? Kitchens, bathrooms and internal reworks often cost less. Every job gets its own estimate.
What drives the cost
Two extensions with the same floor area can be a long way apart in price. These are the five things that move it most.
-
Size
More floor area means more frame, roof, cladding, lining and flooring. But cost does not rise in a straight line: permits, engineering, connections and setting up the site cost much the same on a small job as a larger one, so a very small extension costs more per square metre.
-
Wet areas
Bathrooms, ensuites and laundries are the most expensive rooms in any extension. They need plumbing and drainage, waterproofing done to standard and inspected before tiling, tiling, and fixtures. Adding one is usually what takes a job well past the starting figure.
-
Structure
How the extension joins the house matters as much as the extension itself. Opening up an existing wall needs a beam, a new roof has to tie into the old one, and the floor sits on stumps or a slab depending on the ground. Going up a storey means the existing walls and footings have to carry it, which is why second storeys are priced one by one.
-
Your site
Access for machinery and materials, slope, soil type, easements and overlays all show up in the price. On parts of the Peninsula a bushfire rating, a vegetation overlay or an old septic system can add work before a single stump goes in.
-
Finishes
Flooring, joinery, tapware, windows and appliances can swing a budget by tens of thousands on the same floor plan. These are usually allowances in an estimate, so it pays to know what each allowance actually buys.
A worked example: our Carrum Downs extension
A recent job of ours, just north of Frankston, shows how those five drivers play out on a real family home. We do not publish what any client paid, so here is the job instead of the number.
- Size: 55 m² of new floor area on the back of a single-storey brick veneer house, holding two bedrooms with robes and a long rumpus room with built-in storage.
- Wet areas: none. No new bathroom, ensuite or laundry, which kept plumbing, waterproofing and tiling out of the job.
- Structure: a timber frame on stumps, clad in weatherboards rather than brick, so it did not wait on a bricklayer. The new skillion roof runs up and over the old eave and ties into the existing tiled roof.
- Site: it still needed a soil report, structural engineering, an energy rating solution and consent to build over an easement before anyone dug a stump hole, then four mandatory inspections.
- Finishes: timber-look floors, VJ panel feature walls and split systems.
From starting on site to practical completion took about three months. A single storey, no new wet area and lightweight cladding are what kept it at the simpler end of what we build. Add an ensuite, open up more of the existing house or go up a level, and the same family could be looking at a very different number.
Getting a real number for your house
A starting figure tells you whether you are in the right conversation. It cannot tell you what your extension will cost. For that we start with a Qualifying Build Estimate: a paid proposal that puts an allowance or a dollar-per-square-metre value against each area of your project and gives you an expected build spend range.
We deliver it within seven days of payment, then sit down with you for an hour to go through it. It is designed to answer the budget question early, while your design can still change, instead of after months of drawings.