Budgeting · 2 min read
What open-book pricing actually means
Plenty of builders say their pricing is transparent. Here is what that should actually look like on paper, and the four contract terms where most budget surprises hide.
Checked against official sources 23 November 2026
Lump sum vs open-book
A lump-sum quote gives you one number. Somewhere inside it are the trade prices, materials, allowances, the builder’s margin and a cushion for risk, but you cannot see any of them. When something changes, you have nothing to measure the new price against.
Open-book means you see the numbers the builder sees: the trade quotes, the material costs, the allowances, and the margin on top. When a variation comes up, it is priced the same way, in writing, before the work is done. You can check any line, question any line, and see exactly where your money goes.
The four terms where surprises hide
Most building disputes start with someone not understanding one of these. Ask about each one before you sign anything.
-
Prime cost items
An allowance for something not yet chosen, usually supply only, like tapware, appliances or tiles. If you choose something dearer than the allowance, you pay the difference. A low allowance makes a quote look cheaper than the house you actually want.
-
Provisional sums
An allowance for work whose cost cannot be known yet, such as excavation where nobody knows what is in the ground. It usually covers labour and materials. Ask how each one was worked out, and what happens if it runs over.
-
Variations
Any change to the work in the contract, whether you ask for it or the site forces it. A variation should be priced and agreed in writing before the work happens, never billed after the fact.
-
Extensions of time
The process for moving the completion date, for example because of weather or a change you have asked for. Know what counts as a valid reason, and how you will be told.
How a good estimate is built
A price is only as good as the information behind it. Before you compare two quotes, check whether they are pricing the same thing, and how much of each one is allowances rather than real prices.
- Is it based on full construction documents, or on a sketch?
- Which items are firm prices, and which are allowances?
- Where the drawings are unclear, did the builder ask, or guess?
- Does it list labour, contractors, materials and allowances separately?
How we price
We price in two stages. The Qualifying Build Estimate comes first: a paid proposal that puts an allowance or a dollar-per-square-metre value against each area of the project and gives you an expected spend range, so you know early whether the house you want is achievable on your budget.
Once construction documents exist, we prepare the Final Build Estimate: a 100-point estimate covering major component labour, contractor costs, materials and ancillary allowances. Where something is unclear we raise a Request for Information rather than guess, and we walk you through every line before the contract is drawn up.