Planning · 4 min read

Building or renovating? The first steps, in the right order

Most budget blowouts are decided before a builder is ever on site. Here is what to sort out first, and in what order, so the money goes into the house instead of into redesigns.

Checked against official sources 23 November 2026

A weatherboard bungalow before any work started, on an unlandscaped block

Why the order matters

The expensive mistakes on a renovation or new home are rarely made with a hammer. They are made months earlier: a design drawn before anyone checked the budget, a plan that the block’s overlays will not allow, or a builder brought in only once the drawings are finished and every change costs a redraw.

None of the steps below cost much. Doing them before you commit to a design is what keeps the project you want and the project you can afford the same project.

The first steps

  1. Write down what is not working

    Before anyone talks about floor plans, list what is wrong with the house now: not enough bedrooms, a kitchen that cuts you off from the kids, a bathroom that leaks, no room to work from home. Then split your wishes into must-haves and nice-to-haves. That list is the brief, and it is the most useful thing you can hand a designer or builder.

  2. Set an honest, all-in budget

    Work out the total you can spend, not just the build. Design, engineering, surveying, permits and connection fees all come out of the same pocket, and so does a buffer for the unknowns, which matter most on older homes. If you are borrowing, talk to your lender now: construction loans usually pay out in stages, and knowing how yours works affects the contract.

  3. Find out what your block allows

    Get the free planning property report for your address from VicPlan. It shows your zone and any overlays, such as heritage, vegetation, bushfire or flooding, and many Bayside and Peninsula blocks carry at least one. Also look at your title for easements and covenants. These decide what can be built, where, and whether you need a planning permit, so it is far better to know before you design.

  4. Know the two kinds of permit

    A planning permit comes from your council and deals with whether the use and design are allowed on your land. Not every project needs one; your zone and overlays decide that. A building permit is issued by a registered building surveyor and deals with whether the work is safe and compliant. Most structural work needs one, and it must be in place before work starts.

  5. Choose your design route

    You can engage a designer or architect yourself, or bring in a builder who will help you find a designer whose strengths suit your brief. If you already have drawings, a builder can price and consult on those instead. Either way, give your designer the budget along with the brief. A beautiful design you cannot afford to build is the most expensive drawing you will ever pay for.

  6. Get a builder’s numbers before the design is finished

    This is the step most people skip. An early estimate, done while the design can still change, tells you whether the house you are drawing is achievable on the budget you have. Finding that out after months of design means paying to redraw it. Finding it out early means the design is shaped around real numbers from the start.

  7. Check the builder properly

    Registration, insurance, the contract, how variations are handled and who will actually be on your site. We have a separate checklist for this, because it deserves more than a line.

  8. Plan for realistic timeframes

    Design and permits often take longer than the build. For a full renovation or new home, allow months for design and approvals before anyone starts on site, then think about where you will live during the works and what that costs. Ask any builder for their real next available start date, not the one you would like to hear.

What to have ready for a first meeting

  • Your list of problems, must-haves and nice-to-haves.
  • Your all-in budget, or at least a range you are comfortable with.
  • Your planning property report and a copy of your title.
  • Any existing plans of the house, even old ones.
  • Photos of homes, kitchens or details you like, and ones you do not.
  • When you would ideally like to start, and any dates that cannot move.

You do not need all of it. But each item you bring turns a general conversation into a specific one, and makes any early estimate more accurate.

How this works with us

Every job we take on starts with a short questionnaire and a first meeting about fit, not floor plans. If your project suits us, the next step is our Qualifying Build Estimate: a paid proposal that puts an allowance against each area of the project and gives you an expected build spend range, delivered within seven days. It exists to answer the budget question while your design can still change.

Official sources

General information, not legal or financial advice. Rules change, so check the sources above for the current position before you sign anything.