Choosing a builder · 3 min read
How to check a builder before you sign
A good builder will expect you to check them, and will make it easy. These are the checks worth making on anyone you are about to hand a deposit to, us included.
Checked against official sources 23 November 2026
The legal checks
Victoria sets clear rules for domestic building work, and most of them exist to protect you. The checks below take minutes, and they are worth doing on any builder, however well recommended.
-
Check their registration
If the work costs more than $10,000, the builder must be a registered building practitioner. Search their name or registration number on the Building and Plumbing Commission’s register, and check that the class of registration covers your kind of work. Look at the disciplinary register while you are there.
-
Get a proper contract
Work over $10,000 needs a major domestic building contract. Read it before you sign, and if a builder will not give you time to read it or have it checked, treat that as your answer.
-
Confirm Home Warranty insurance
From 1 July 2026, domestic building work worth more than $20,000 on a home of three storeys or less is covered by the State’s Home Warranty insurance, run by the Building and Plumbing Commission. It covers incomplete, faulty and non-compliant work. Do not pay a deposit until the builder has given you a certificate for your property.
-
Know the deposit limits
By law, a deposit cannot be more than 10% for contracts under $20,000, or 5% for contracts of $20,000 or more. A builder asking for more is breaking the rules before the job has started.
-
Do not pay ahead of the work
Progress payments should follow completed stages of work. Consumer Affairs Victoria warns that insurance may not cover work you pay for before it is completed.
The questions to ask
Passing the legal checks makes a builder legal. It does not make them the right builder for you. These questions sort that out.
- Who will actually be on my site day to day, and will I deal with them directly?
- How do you price? Will I see trade quotes and allowances, or one lump sum?
- How are variations handled? Are they priced and approved in writing before the work is done?
- What are the prime cost items and provisional sums in this contract, and how were the allowances set?
- When could you realistically start, and how long will the job take?
- Can I see a finished job like mine, and speak to the client?
- What do I get at handover?
Read reviews, but read case studies more closely. A builder who shows you the problems they hit on a job, and how they priced and solved them, is showing you how they will treat yours.
Where we stand on each
- Registered Domestic Builder Unlimited (CDB-U 75629) and Commercial Builder Low Rise (CCB-L 100254).
- Our deposit is 5% of the contract value, invoiced after the contract is signed.
- Josh or Nathanael run every job themselves. You are not handed to a project manager you have never met.
- Open-book pricing: trade quotes, allowances and every variation go to you in writing before the work happens.
- Before you sign, we run a Contract Education Session covering variations, extensions of time, prime cost items and provisional sums.
Official sources
- Building and Plumbing Commission: Find and check a practitioner
- Consumer Affairs Victoria: Domestic building consumer guide
- Consumer Affairs Victoria: Contracts
- Consumer Affairs Victoria: Insurance and insolvency
- Consumer Affairs Victoria: Deposits and payments for building work
- Consumer Affairs Victoria: New domestic building contract laws passed
General information, not legal or financial advice. Rules change, so check the sources above for the current position before you sign anything.