Knockdown rebuilds

Demolish the old house. Build the one you actually want.

A lot of the best blocks on the Peninsula already have a house on them - just not the right one. A knockdown rebuild clears what is there and builds new in its place, on a site you already know and in a street you already want to live on. We can run the whole thing, demolition through to handover, as a custom build or with REZICAST®.

What happens before a single brick goes up

A knockdown rebuild needs two permits before site work starts, not one: a demolition permit and a building permit for the new home. We manage both.

Asbestos and services, checked first

Older homes often carry asbestos, which has to be tested for and cleared by a licensed contractor before demolition starts - we have coordinated exactly that on a previous job and will not proceed without the clearance certificate in hand. Power, gas, water and sewer connections to the old house also have to be formally disconnected first.

What is actually under the block

We have twice found things on a Peninsula block that were on no plan anywhere - an old septic tank and a run of buried concrete, in both cases sitting where footings were meant to go. Clearing the old house does not make that risk disappear, so we allow for it rather than assume it away.

Two permits, not one

The demolition itself needs its own permit, separate from the one for the new home. We sequence both so the site is cleared and ready the day the new build is allowed to start, rather than sitting idle between the two.

Priced before it is dug

If something turns up that was not on the plans, it gets priced and put in writing before we dig any further - the same open-book rule that applies to every job we run, not something reserved for new builds.

Then you choose how it gets built

Same cleared block either way. The difference is the build itself.

Questions people ask

Still deciding whether to knock down at all?

Renovate, extend or rebuild: our guide
Do you organise the demolition, or just the build after it?
We can run the whole thing, including the demolition permit and the demolition itself, so you are dealing with one builder rather than coordinating a demolition contractor yourself and handing us a cleared block.
What usually turns up that is not on any plan?
On the Peninsula it is often a septic tank or a run of buried concrete from before the mains went through - we have found exactly that at two separate addresses, in both cases with footings planned for where it turned out to be. Older homes can also carry asbestos, which has to be tested for and cleared by a licensed contractor before anything else starts; we have coordinated that on a previous job and will not start until the clearance certificate is in hand. None of this is unusual, but it has to be allowed for rather than discovered.
Can I build the same home either way - custom, or REZICAST?
Both start from a cleared block, so the choice is about how the new home gets built rather than the demolition. A custom build is drawn and built to your own plans. REZICAST swaps the brickwork for engineered precast concrete panels and gets you to lock-up in 10 to 14 days, but it does not suit every block or every design - we will tell you straight which one fits your site.
How long does the whole thing take, start to finish?
Longer than a build on a vacant block, because a demolition permit and a new home building permit both have to be in hand before site work starts. Once permits are through, a custom new home is typically 3 to 4 months on site; REZICAST gets the shell to lock-up in 10 to 14 days and to handover in 10 to 14 weeks. You will get a real timeline for your own site and permit situation at the first meeting.

Got a block with a house you're ready to see gone?

Send us the address. We will tell you what the demolition and permit process looks like for that specific site, and whether custom or REZICAST® is the better fit.