For owner-builders
We build the shell. You finish the rest.
A cold shell is a house built to lock-up: framed, roofed, clad and glazed, weathertight and secure, with nothing done inside. It suits owner-builders who want to manage or do their own fit-out - tiling, cabinetry, floors, paint - and only need a registered builder for the part that actually requires one.
Drawn on paper, not in conversation
Stopping at lock-up only works when the line is agreed before anything is signed. Everything past that line is yours to organise and pay for - here is where we draw it.
What we hand you
- Demolition or site works, where the job needs them
- Framing, roof and stormwater
- External cladding, windows and doors installed
- Weathertight and secure, ready to lock
What's yours to finish
- Painting
- Tiling
- Cabinetry and joinery
- Floor coverings
- Electrical fit-out
This is the exact split we agreed in writing on a real Blairgowrie job before a single nail went in - nothing was added to the list halfway through. Read how that one went .
The faster way there
Lock-up in 10 to 14 days with REZICAST®
REZICAST® swaps the brickwork for engineered precast concrete panels, craned up in a day. For a new home, it reaches the same weathertight, locked-up shell in 10 to 14 days rather than the months a conventional frame takes - then it is yours to fit out on your own schedule. We are an accredited REZICAST® builder.
How REZICAST® works
Questions people ask
- What do I actually get handed back at lock-up?
- A house that is framed, roofed, clad and glazed - weathertight and secure. What is in and what is out is agreed in writing before anything is signed, the same way it was on the Blairgowrie job this page is based on, so there is no argument later about where our work stopped.
- Can I bring in my own trades for the rest?
- Yes - that is the point of stopping at lock-up. On the Blairgowrie job, painting, tiling, cabinetry, floor coverings and electrical were all listed as exclusions from day one, and the owner organised and paid for every one of them directly.
- Do I need to be a registered owner-builder to finish it myself?
- Depends on the work and what it is worth, and that is a question for the Building and Plumbing Commission rather than us - they issue the Owner-Builder Certificate of Consent, not your builder. Talk to them before you sign anything, and we are happy to talk through what we have seen work on other jobs once you know where you stand.
- Is a cold shell cheaper than a full contract?
- It is a smaller contract, because it is a smaller scope - not a discount on the same job. What you save is whatever you would have paid us for the fit-out, less whatever it costs you to organise that yourself.
- Can I get to lock-up faster than a conventional build?
- Yes, with REZICAST®. It swaps the brickwork for engineered precast concrete panels craned up in a day, and reaches lock-up in 10 to 14 days against months for a conventional frame. New builds only, and not every block suits it.
Know roughly where you want the line drawn?
Tell us what you want to finish yourself and what you want handed back to you. We will tell you straight whether it works for your site and your plans.